Bathroom Renovation in Palm Beach Gardens.
Many Palm Beach Gardens homes still have their original bathrooms: tub-shower combinations, cultured marble and builder-grade fixtures. Updating them is one of the most noticeable improvements you can make, in daily comfort and at resale. We handle everything behind the walls as carefully as the finishes in front of them.
A quieter kind of contractor.
- 01
Licensed, and accountable.
DeVega Construction LLC is a Florida Certified Residential Contractor, license CRC1333292. The name on the license is the name on your contract.
- 02
A written scope, line by line.
Your quote lists what is included and what is not, so the number you approve is the number you plan around.
- 03
Permits handled for you.
We prepare the drawings and paperwork, pull the permit, schedule the inspections and meet the inspector.
- 04
A clean house at the end of every day.
Floors are protected, dust is contained, and the work area is cleaned before the crew leaves.
What the work includes.
Your written proposal lists exactly what applies to your home. Permits go through the City of Palm Beach Gardens.
- Primary bath remodelsLayouts opened up, finishes upgraded
- Guest and hall bathsDurable, easy-care updates
- Walk-in showersFrameless glass, linear drains, built-in niches
- Tub-to-shower conversionsA popular change in older homes
- Aging-in-place featuresGrab bars, benches and low thresholds
- WaterproofingSealed membranes behind every wet wall
- TileFloors, walls and feature walls
- VanitiesStone tops, undermount sinks and storage
- FixturesValves, rain heads, handhelds and toilets
- VentilationExhaust sized to the room
- PermitsPulled and closed through the City of Palm Beach Gardens
- CleanupDust contained and cleaned daily
How the project unfolds.
- Phase01
Consultation
We see the room and talk about how you use it.
- Phase02
Selections
Tile, fixtures, vanity and glass chosen; written scope.
- Phase03
Demolition and rough-in
Plumbing and electrical updated.
- Phase04
Waterproofing and tile
Sealed first, then tiled.
- Phase05
Finish and walkthrough
Glass, fixtures and a detailed review with you.